Installing 5000/5100; Setting Up The Terminal; Table 8: Stages Of Installation - CipherLab 5000 Hardware Manual

Table of Contents

Advertisement

2. I
NSTALLING

2.1 Setting up the terminal

The whole installation can be simply classified into the following stages:
Site Survey:
Choose a location that is close to the target door and provides clearance for the cables
and access to an AC outlet.
Mounting:
-
Drill holes on the wall.
Mount the lower enclosure on the wall.
-
Attaching:
Attach optional accessories to the PCB.
Wiring & Connecting:
Connect wires to terminal blocks.
-
Connect connectors to receptacles.
-
-
Connect to Ethernet networks.
Assembling:
Secure enclosures.
Power Supplying:
Connect to an appropriate wall outlet.

Table 8: Stages of installation

The site survey should take both location and topology into consideration. And the
actions specified for each stage should be taken with care to avoid any damages to
the terminals or peripherals.
To ensure proper wiring and safe operation, we strongly recommend that the terminals be
set up by an experienced electrician.
5000/5100
23