ELECTRO FREEZE Shake Model CS700-FG
7
Assembly
Figure 7-4 Head Bushing
Figure 7-5 Head Assembly
18
— continued
6. See figure 7-5 and o-ring chart
in the Replacement Parts Section. Install
and lubricate the o-rings (4, 5) on the
plunger (6). Insert halfway into the head
(1), with the rectangular flat side facing
the front.
7. Lubricate the inside surface of
the head bushing (2) and place in the
head (1) making sure to align bushing key
into head slot, as shown in figure 7-5.
—continued
185231-17