Heating Up The Boiler - Froling SP Dual compact Operating Instructions Manual

Dual fuel boiler
Hide thumbs Also See for SP Dual compact:
Table of Contents

Advertisement

Operating the system

Heating up the boiler

3.3.3 Heating up the boiler
Operating Instructions SP Dual compact | B1500016_en
❒ Open the insulated door and the fuel loading door
❒ Check the ash level in the combustion chamber and clean if necessary
➥ Recommendation: Do not remove the ash in the combustion chamber each
time you heat up the boiler, only when the middle row of holes in the cladding
plates is no longer visible. This protects the combustion chamber and makes
the heating-up process more efficient.
❒ Add one layer of firewood
➥ Use firewood with a length of approximately 50 cm and arrange it lengthwise
➥ Do not completely cover the flame slot (A).
❒ Place some scrunched-up paper at the front against the fuel loading door
❒ Cover the first layer of firewood with cardboard
❒ Fill the fuel loading chamber in accordance with the output
⇨ See "Determining the right amount of fuel" [page 24]
3
27

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP Dual compact and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

S1 turbo

Table of Contents