Froling SP Dual compact Operating Instructions Manual page 49

Dual fuel boiler
Hide thumbs Also See for SP Dual compact:
Table of Contents

Advertisement

Boiler servicing
Emissions measurement by chimney sweep or regulatory body
Operating Instructions SP Dual compact | B1500016_en
Once the basic firebed has been achieved (top row of holes visible in the combustion
chamber guards):
❒ With the doors closed, press the chimney sweep button (boiler with button display)
or activate chimney sweep function in the quick menu (boiler with touchscreen)
➥ The boiler temperature setpoint will be automatically set to 85°C for 45 minutes
➥ All of the configured heating circuits will be activated at maximum flow
temperature for 45 minutes
❒ Open the fuel loading door and fill the boiler with the maximum permitted amount
of fuel
➥ If the boiler has activated reload calculation, the amount of fuel required will be
shown on the screen
❒ Close the doors and wait approx. 10 minutes until the combustion process is
under way
❒ Take the measurement at the designated measuring port
➥ Regularly check the that the conditions are stable:
- Boiler temperature > 70 °C
- Flue gas temperature around 170 °C
4
49

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the SP Dual compact and is the answer not in the manual?

This manual is also suitable for:

S1 turbo

Table of Contents