Aztec 600 aluminium, ammonia, color, iron, manganese, phosphate
Single- and multi-stream colorimetric analyzers
8. Press the
key and use the
'Operate'.
9. Use the
and
Calibrate' and press the
When the priming sequence is complete, a stabilizing
period is initiated to allow the measurement cell
temperature to stabilize. Once stabilized, calibration is
performed automatically; the analyzer then enters
measuring mode.
IM/AZT6CR–EN Rev. J
and
keys to select
keys to select 'Prime lines and
key.
3.2 On-line Help
Fig. 3.1 On-line Help
If any alarms or messages appear on the operator screen, press
the
key to open the help at the relevant diagnostic help
topic. For example, if the 'Calibration Failed' message is active
and the help is opened, the help opens at the 'Calibration Failed'
diagnostic topic.
1. Press the
key and use the
'Help'. Press the
key to open the help.
2. To exit the on-line help, press the
the screen from where help was selected from.
3 Getting Started
Message Continued
and
keys to select
key until returned to
11