Power Connections and Options

Primary power for the 7847i-E is provided by the auxiliary power output of the control panel
9.6V –13.8V, typical, or other external power source.
When calculating the total load on the auxiliary power output of the control panel,
must be budgeted for the 7847i-E. Under normal operating conditions, the unit will not pull
more than 20mA; however, it will draw 75mA during a transmission.
Connect the wires from the (+) and (–) terminals of the DC power source to terminals V+ and
GND on TB1 of the 7847i-E. Observe Polarity!
If using an external power source, connect GND from power supply to GND of the control
panel.

Ethernet Connections

U L

Initial Power-Up Sequence

Before connecting power, check that the following have been completed:
Terminal block TB1 V+ and GND terminals are connected to the control panel's auxiliary
power output: 12 VDC nominal.
Power up the control panel.
Initially, all 7847i-E programming options are set to the factory default settings.
NOTE: Refer to Appendix A for detailed information on LED functions.
2-4
1. For UL installations, the Cat. 5 Ethernet connections between the 7847i-E and
the router cannot exceed 12 feet with both the 7847i-E and the router located
within the same room.
2. Use a Listed cable/DSL router suited for the application.
Connect one end of the Ethernet cable (Category 5) to the 7847i-E's RJ45 Ethernet
connector and the other end to the cable/DSL router.
Figure 8. Ethernet Connections