Page 1
Zero Clearance Direct Vent Gas Fireplace Installation Manual www.regency-ire.com STYLE MODEL Single sided CV40E-NG / CV40E-LP Three sided CB40E-NG / CB40E-LP Warning FIre or explosion Hazard failure to follow safety warnings exactly could result in serious injury, death, or property damage.
Page 2
CB40E City Series have been approved by Intertek for both safety and eficiency. As it also bears our own mark, it promises to provide you with economy, comfort and security for many trouble free years to follow. Please take a moment now to acquaint yourself with these instructions and the many features of your Regency ®...
MANUFACTURED MOBILE HOME REQUIREMENTS INFORMATION FOR MOBILE/MANUFACTURED HOMES AFTER FIRST SALE This Regency ® product has been tested and listed by Intertek as a Direct Vent Wall Furnace to the following standards: VENTED GAS DECORATIVE FIREPLACE CAN/CGA-2.17-M91, and ANSI Z21.50-2014 • CSA 2.22-2014 and GAS-FIRED APPLIANCES FOR USE AT HIGH ALTITUDES CAN/CGA 2.17-M91.
CSA 2.22-2014 MAY BE INSTALLED IN MANUFACTURED (MOBILE) HOMES AFTER FIRST SALE. 4001172 APPAREIL FONCTIONNANT AU GAZ NATUREL Minimum Clearances to Combustibles / NATURAL GAS: Model: CV40E-NG/CB40E-NG Dégagement minimum des matériaux combustibles CONÇU POUR FOYER :Modèle CV40E-NG/CB40E-NG Minimum supply pressure Pression d'allimentation minimum 5.0"...
requirements MA Code - CO Detector (for the State of Massachusetts only) 5.08: Modifications to NFPA-54, Chapter 10 (2) Revise 10.8.3 by adding the following additional requirements: (a) For all side wall horizontally vented gas fueled equipment installed in every dwelling, building or structure used in whole or in part for residential purposes, including those owned or operated by the Commonwealth and where the side wall exhaust vent termination is less than seven (7) feet above finished grade in the area of the venting, including but not limited to decks and porches, the following requirements shall be satisfied:...
installation Important Message WE RECOMMEND REMOVING THE CHILDREN AND ADULTS SHOULD BE SAVE THESE INSTRUCTIONS GLASS WITH THE GLASS VACUUM ALERTED TO THE HAZARDS OF HIGH HOLDERS SUPPLIED BY THE MANU- SURFACE TEMPERATURES, ESPE- City Line Direct Vent Fireplaces must be installed FACTURER.
installation General Safety Information Installation Checklist This includes: 1. Clocking the appliance to ensure the correct 1. The appliance installation must conform with 1. Locate appliance. Refer to the following sections: iring rate (rate noted on label 28,500 Btu/h NG/ local codes or, in the absence of local codes, a) Locating Your Fireplace LP) after burning appliance for 15 minutes.
installation Locating Your Unit Assembly Prior to Installation Gas Fireplace Before you start 1. When selecting a location for your ireplace, The CV40E has 6 standoffs, 2 on each side and 2 at the back that need assembly before installation. ensure that the clearances are met.
Page 12
installation Nailing strips CV40E Nailing strips are shipped folded lat against the unit. Fold nailing strips out 90º before installing unit. Secure nailing strips to framing using wood or metal screws. Nailing strips Nailing strips CB40E Nailing strips are shipped with the appliance and will need to be attached.
installation Clearances CV40E (single sided) The clearances listed below are Minimum distances unless otherwise stated: A major cause of chimney related ires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this ireplace and vent system be installed only in accordance with these instructions.
installation Clearances CB40E (3 sided) Floor to ceiling with top opening Low framing with vents in front/sides or top Full framing with low vents in front or sides Full framing with vents in front or sides City Series |...
installation Mantel Clearances CV40E Single sided / CB40E 3 sided Combustible mantel clearances from top of front facing are shown in the diagram on the right. Drywall, wood, wood panel, etc. Combustible Material Wood Stud (On Edge) 12" (305mm) Standoff 9”...
installation Framing Dimensions CB40E (3 sided) NOTE: Framing may be constructed of combustible material (ie. 2x4) and does not require steel studs. Two (2) optional steel stud kits may also be purchased. These kits may be used in place of the conventional wood framing as shown below. It comes as a compact kit (lush to the appliance on all sides)or an extended kit.
installation optional framing kit Installation CB40E Optional Extended and Compact Framing Kits Tools/hardware needed are as follows: - Level The following procedure shows the assembly of the extended framing kit—the - Stud fi nder installation of the compact framing kit is identical except part 656-224 (Step - Cordless screwdriver 24) is not required.
Page 20
installation 4. Slide unit into position. Check to ensure that the unit is level from front to back 2. Install Part B1 + B2 to Part A with 2 screws on each side from the front of and side to side and Parts A + B are square. Secure the unit with framing the unit.
Page 21
installation 10. Telescope LEFT + RIGHT sides up to desired height. Fasten both 7. Install one screw (lower screw position) into B1 and B2. Hang the pre sides once in place with self tapping screws. assembled RIGHT sidewall off the 2 screws using the keyhole open- ing on the sidewall.
Page 22
installation 16. Position Part I (x2) to fi t in the indent in Part H (x2) secure each Part 12. Attach Part B3 to extended LEFT and RIGHT sides with two screws I with 8 screws each - 4 top/4 bottom. on each side (from the front).
Page 23
installation 24. Attach the opposite corner brace Part P to the RIGHT side and lower 18. Swing Part N (x2) and Part O (x2) out from B2 + B3. Part H with 2 screws from the top. 19. Part N (L) will be secured to B3 - LEFT side assembly and Part L with 4 screws in total.
Page 24
installation Extended Kit Overall Dimensions: Width: 60-1/2 " Depth: 18-11/16" Height: min. 80" max. 10' Compact Kit Overall Dimensions: Width: 48-7/16" Depth: 18-11/16" Height: min. 80" max. 10' Min/Max Height measured from base of appliance/ fi nished fl oor. Note: Bottom cover for extended framing Front view Part ID - extended shown kit only Back view Part ID - extended shown...
installation Optional compact wood panel kit Installation CB40E The compact panel kit is used in conjunction with the compact framing kit. 4. Reach inside the framing kit and tighten the screws on the panels to eliminate Install the compact framing kit before installing the panels. any movement or shifting of the panels—once installed.
Page 26
installation 9. Install the top side panels, these panels do not allow for the screws to be 5. Install the front middle panel, position the brackets at the bottom of the tightened once installed. If these panels require adjusting—pre-tighten the middle front panel in behind the front lower panel.
installation Optional compact wood panel kit Installation CB40E CV40E Glass Trim (Black Glass) Installation The compact side glass trim pieces (black glass) may be installed to complete 3. Carefully maneuver side trim piece into position—sliding it from the front the side of the appliance until the tabs on the side of the trim click into place with the unit.
installation Optional extended wood panel kit Installation CB40E The extended wood panel kit is used in conjunction with the extended framing NOTE: After installation, ensure all three lower panels are at the same level kit. Install the extended framing kit before installing the panels. at the bottom.
Page 29
installation 6. Install the two middle side panels—tighten the screws for these panels from the inside of the framing. (See Step 4 for details) 8. Install the top side panels, these panels do not allow for the screws to be tightened once installed. If these panels require adjusting—pre- tighten the screws before hanging the panels to obtain desired position of the panels.
installation Optional extended wood panel and TV bracket kit Installation CB40E The compact and extended wood panel and TV kits are used in conjunction 6. Run the BX cable down the back of the unit and to the electrical box located with the compact/extended framing kits.
Page 31
installation 9. Install the front lower panel fi rst, line up the screws on the back of the panel NOTE: After installation, ensure all three lower panels are at the same level with the keyholes on the framing kit. at the bottom. Also ensure that the side panels are sitting exactly at 90º and not tilting inward or outward as the correct installation of the middle and top 10.
Page 32
installation 14. Install the two middle side panels—tighten the screws for these panels from the inside of the framing. (See Step 9 for details) 17. Install the top side panels, these panels do not allow for the screws to be tightened once installed. If these panels require adjusting— pre-tighten the screws before hanging the panels to obtain desired position of the panels.
installation Optional extended hearth kit Installation CB40E NOTE: Prior to installing the extended hearth kit, both the gas/electrical should 3. Secure the leg with 2 screws on each side—4 screws total. be installed. This optional Extended hearth kit is 8- 1/2 inches high ( without leveling legs 4.
Page 34
installation 6. After installing supplied feet tilt assembled hearth over 90º. 8. Slide assembled hearth into position around unit. Tip hearth back onto feet/bottom 7. If using hearth panel kit/glass hearth top, remove removable trim (5 pieces) 9. Temporarily place the hearth top fi nishing materials on top of the hearth from the unit prior to sliding hearth into position.
installation Optional compact & extended hearth panel kit Installation CB40E 2 Hang the panel by matching the screws at the back of the panel to the cor- The compact or extended hearth panel kits are used in conjunction with the responding keyholes and lower the panel until the screws rest at the bottom compact or extended hearth framing kits.
installation Optional Front Grill Installation This optional grill meets the requirement of the 120 square inches required for the enclosure in all installations and is designed to keep the enclosure cool. To install the front grill - frame an opening of 4-3/8" H x 39-1/8" W. The inished facing material should be attached and be the same size as the framed opening to eliminate gaps.
installation Optional Side Grill Installation OPTIONAL SIDE GRILL INSTALLATION CB40 WITH WOOD CHASE These optional grills meet the requirement of the 120 square inches required for the enclosure in all installations and is designed to keep the enclosure cool. To install the side grills - frame an opening of 8-5/16" H x 8-5/16" W. The inished facing material should be attached and be the same size as the framed opening to eliminate gaps.
installation Wall Board/Drywall Installation CV40E/CB40E WARNING! Risk of Fire! Comply with all minimum clearances to combustibles as speciied. Finishing Instructions It is important to follow the framing and inishing instructions to ensure proper placement of ireplace into the surrounding framing/inishing materials. Wall board materials 1/2 in.
installation Framing and Finishing Inset Installations CV40E 1. Frame in the enclosure for the unit with framing material Note: When constructing the framed opening ensure there is access to install the gas lines,electrical. Also the wiring harness must be wall mounted using the receptacle provided with the appliance.
installation Framing and Finishing Inset Installations CB40E 1. Frame in the enclosure for the unit with framing material Note: When constructing the framed opening ensure there is access to in- stall the gas lines,electrical. Also the wiring harness must be wall mounted using the receptacle provided with the appliance.
Ensure wiring is secured without any sag. IMPORTANT: Temperature acceptance levels in TV’s vary greatly. Before installing any electronic appli- ance above this ireplace, irst verify temperature requirements from the TV manufacturer. Regency will not be responsible for heat damage to electronic appliances.
installation Exterior Vent Termination Locations Minimum Clearance Requirements Canada Clearance above grade, veranda, porch, deck, or balcony 12"(30cm) 12"(30cm) Clearance to window or door that may be opened 12"(30cm) 9" (23cm) Clearance to permanently closed window Vertical clearance to ventilated sofit located above the terminal within a horizontal distance of 2 feet (61cm) 18"(46cm) 18"(46cm) from the center line of the terminal (check with the local code)
installation 4” x 6-5/8” Rigid Pipe Cross Reference Chart Components from different Manufacturers may not be mixed. Not All Rigid Pipe components are available directly from FPI. Description Selkirk American Metal Security ICC Excel Simpson Metal-Fab™ ® Direct Temp™ Products® Secure- Vent®...
Page 44
installation Description Selkirk American Metal Security ICC Excel Simpson Metal-Fab™ ® Direct Temp™ Products® Secure- Vent® Direct Direct Vent Pro Sure Seal Amerivent Direct Attic Insulation Shield 12” 46DVA-IS 4DAIS12 SV4RSA N/A@ FPI Attic Insulation Shield - 36” 4DAIS12 TM-4AS Cold Climates Basic Horizontal Termination Kit (A) Disc.
installation wall mount On / Off Switch and battery holder installation required for all installations IMPORTANT INSTALLATION NOTE: The Battery Holder must be placed inside the supplied (Low Voltage) junction type wall box and installed into the wall only. DO NOT INSTALL WITHIN THE CONFINES OF THE FIREPLACE SWITCH MUST BE ACCESSIBLE Battery Holder Installation 1.
installation Vent Restrictor Position Vent restriction is required for certain venting installations, see the diagrams in the "Venting Arrangements" section to determine if they are required for your installation. The Vent Restrictor plate is packed in the instruction manual package. To set the vent restriction as indicated in the venting arrangements diagrams, refer to the following instructions;...
S.S. screws #8 x 1-1/2” drill point Notes: 1. Liner sections should be continuous without any joints or seams. ® 2. Only Flex pipe purchased from Regency may be used for Flex installations 3. Horizontal vent must be supported every 3 feet. ®...
NOTE: A minimum of 1' (305mm) vertical off the top of the unit is required before any horizontal runs can start. Note: For horizontal terminations the Regency Direct Vent Flex System may be used for installations with a maximum continuous vent length of up to 10 feet.
installation Horizontal Terminations " Rigid Pipe 4" x 6-5/8 The minimum components required for a basic horizontal termination are: Horizontal Termination Cap Rigid Pipe Adaptor (510-994. Horizontal Wall Thimble Termination Cap Length of pipe to suit wall thickness (see chart) Vinyl Siding Wall thickness is measured from the back standoffs to the inside mounting surface of termination cap.
installation Horizontal Terminations " Rigid Pipe 4" x 6-5/8 The diagrams below shows examples of horizontal termination arrangements using one, two, or three 90 elbows (two 45 elbows equal one 90 elbow) 1. A maximum of three 90 elbows are permitted. 2.
installation Vertical terminations " Rigid Pipe 4" x 6-5/8 The minimum components required for a basic vertical Vertical Terminal termination are: Vertical Termination Cap Rigid Pipe Adaptor (510-994) Ceiling Firestop Storm Collar Flashing Storm Collar Length of pipe to suit wall thickness (see chart) Flashing Galvanized pipe is desirable above the rooline due to its higher...
installation Venting Arrangement for Vertical Terminations Vertical Venting with straight Vertical venting and or with a max. of two (2) 90 Elbows (1 - 90 2 - 45 The shaded area in the diagram shows all allowable combinations Horizontal (Feet) of straight vertical and offset to vertical terminations, using two elbows, with Rigid Pipe Venting Systems.
installation Vertical Terminations " Rigid Pipe 4" x 6-5/8 • Two 45 elbows equal to one 90 elbow. Maximum of six 45 elbows allowed. • Vent must be supported at offsets. • Minimum distance between elbows is 1 ft. (305mm). •...
installation Unit Installation with Horizontal 5. Assemble the desired combination of pipe and 7. Ensure that the pipe clearances to combustible elbows to the appliance adaptor and twist-lock materials are maintained (Diagram 3). Install Termination for a solid connection. the termination cap. 4"...
installation Unit Installation with Horizontal NOTE: Horizontal sections must be sup- ASTROCAP ported at intervals not exceeding DIMENSIONS (946-523/P) Termination 3 feet (0.9 meter). (Flame picture 4" X 6-5/8" VENTING and performance will be affected (Flex Vent Systems) by sags in the liner). Minimum Vent Clearances 4.
installation b) Horizontal runs of vent must be supported Dura-Vent every three feet. Wall straps are available Horizontal terminations for this purpose. Install the vent system according to the manufacturer's instructions included with 5) Mark the wall for a 10" x 10" square hole. The the components.
installation Dura-Vent Vertical Termination 4. Assemble the desired lengths of pipe and elbows. Ensure that all pipes and elbow con- 4" x 6-5/8" venting nections are in the fully twist-locked position (Rigid Vent Systems) and sealed. Maintain the 1-1/2" clearances (air spaces) to combustibles when passing through ceilings, walls, roofs, enclosures, attic rafter, or other nearby combustible surfaces.
installation Vertical Termination 4" x 6-7/8" venting 4" X 6-7/8" VENTING - VERTICAL FLEX VENT KIT (946-755) 11. Secure inner l ex pipe to pipe adaptor by using Mill-Pac over the adaptor. 1. Maintain the 1-½” clearance (air space) to combustibles when passing through ceilings, walls, l oors, enclosures, attic rafters or other nearby Slide the inner pipe over adaptor and secure with 3 screws.
LP SYSTEM DATA Min. Supply Pressure 11" WC (2.73 kpa) Note: If you have an incorrect flame Manifold Pressure 10.5" WC (2.62 kpa) ® pattern, contact your Regency Oriice Size #53 DMS dealer for further instructions. Maximum Input 28,500 Btu/h (8.35 kW)
installation Wiring Diagrams No electrical power supply is required for the gas (Do not cut the ground terminal off under any Caution: Ensure that the wires do not control to operate. 120 Volt AC power is needed circumstances.) touch any hot surfaces and are away from for the lights.
installation Inner glass panel (irebox glass) Installation / removal Note: glass panels must be installed to operate ireplace Push side glass WARNING: GLASS HANDLING panel irmly to back wall We recommend using the glass vacuum holders supplied by the manufac- until springs are turer.
Page 63
installation Note: Ensure that the front glass is centered and evenly spaced with side glass 5. Ensure all 7 front clamps are in the open position to allow clearance for the glass. (3 sided unit) - open to release glass clamps to remove from surface of glass. Open clamps prior to placing front...
installation Outer safety glass panel (barrier glass) Installation / removal Note: safety glass panels must be installed to operate ireplace 3. Tilt the top of the glass panel inward and lift up and underneath the upper front panel of the outside frame. Hook the glass panel WARNING: GLASS HANDLING onto the pins and also onto the two angle adjustment brackets lo-...
installation Outer safety glass panel (barrier glass) Installation / removal Note: safety glass panels must be installed to operate ireplace Note: After the side panel has been adjusted so it is installed at 90º to the 4. For 3 sided and corner units only: unit and not laring in or out, check to ensure there is no gap between With front panel installed, proceed to install the side panel(s).
installation LP conversion instructions CV40E/ CB40E using SIT 885 NOVA Gas Valve THIS CONVERSION MUST BE DONE BY A QUALIFIED GAS FITTER IF IN DOUBT DO NOT DO THIS CONVERSION! 6. If unable to access this Cable - undo 2 screws securing the IFC Board WARNING and slide out of unit to access cable.
Page 67
installation 11. Remove burner tray by lifting up and out. CB40E shown 12. Loosen 4 screws in locations shown below (2 at front and 2 at rear)—slide burner 15. Unscrew the pilot orifi ce with the allen key; then replace with the LPG to the left away from the orifi...
Outer Panels-CV40E The CV40E can be equipped with optional steel inner panels. 1. Attach Regency logo to the right hand side of outer front panel. The CV40E - 3 outer panels and 4 inner panels. magnets will be positioned under the outer front base panel to secure the logo.
5. Install metal panel (3) into of front irebox panel. 12. Install media and inner irebox glass prior to next step. 13. Install outer front panel (1) as shown. Secure Regency logo to underside of outer front panel. The logo is simply held in with magnets.
— see manual for instructions. 3. Install back enamel panel - manoeuvre panel into unit and position 2. Attach Regency logo to the right hand side of outer front panel. The magnets panel at back wall of irebox. will be positioned under the outer front base panel to secure the logo. Install NOTE: Side panels when secured, will hold back panel in position.
Turn off unit and allow to cool to room temperature. Remove the safety 1. Attach Regency logo to the right hand side of outer front panel. The glass and irebox glass — see manual for instructions magnets will be positioned under the outer front base panel to secure the logo.
installation CB40E glass panel installation CB40E GLASS PANEL INSTALLATION 1. Turn off unit and allow to cool to room temperature. Remove the outer safety 6. Carefully manoeuvre the back glass panel (4) to the back wall of the irebox. glass and inner ceramic irebox glass panels and any media installed — see Center the glass panel and position bottom of panel into brackets installed manual for instructions.
maintenance CB40E enamel panel installation Black Enamel Panels — Handling Instructions • Black Enamel panels must be inspected for scratches and dimples prior to installation. All claims to be recorded at this time. Claims for damage after installation will not receive consideration. •...
installation Burner and Firebox media options Spread the media evenly over the burner. Ensure the glass/stones do not overlap excessively as this will affect the flame pattern. IMPORTANT NOTE: Only the supplied approved media are to be used with these ireplaces. Use of any other type of glass or stones can alter the unit's performance. Any damage caused by the use of any unapproved glass or stones will not be covered under warranty.
installation Optional driftwood Log set Installation CITY LINE - LOG INSTALLATION Read the instructions below carefully and refer to the images. If the logs are broken do not use the unit until they are replaced. Broken logs can interfere with pilot operation. Improper positioning of the logs may create carbon build-up and can alter the unit's performance which is not covered under warranty.
Page 76
installation 8. Place the split end of Log 3 to the right front corner of the burner—angle Rest the other end of Log 4 on the indent in Log 2 as shown below. the log so that the other end is sitting approximately 1/2" (13mm) from the edge of the burner tray.
installation CV40E (single sided) - Optional inishing trim (when using 1/2" drywall) An optional inishing trim is available to inish the edges of the installation on 5. Install drywall prior to next step. the CV40E unit. Installation is as follows: 6.
operating instructions First Fire Normal Operating Sounds Of Aeration Adjustment Gas Appliances The burner aeration is factory set but may need The FIRST FIRE in your ireplace is part of the adjusting due to either the local gas supply or paint curing process.
operating instructions Lighting Procedure IMPORTANT: The remote control system supplied with this appliance has Note: The irst try for ignition will last approximately 60 seconds. If there is no several options for starting/operating the appliance using the battery holder lame ignition (rectiication) the board will stop sparking for approximately and ON/OFF key on the hand held transmitter.
operating instructions Copy of the Lighting Plate Instructions FOR YOUR SAFETY READ BEFORE LIGHTING POUR VOTRE SÉCURITÉ – À LIRE AVANT LA MISE EN MARCHE This appliance must be installed in accordance with local codes, if any; if none, follow the National Fuel Gas Code, ANSI Z223.1/NFPA 54, or Natural Gas and Propane Installation Codes, CSA B149.1.
For relighting, refer to lighting instructions. Keep ittings have been disturbed, and consequently Regency dealer only. Replacement glass is shipped the burner and control compartment clean by loosened. Also check mechanical supports already installed into the door frame. Reinstall as per brushing and vacuuming at least once a year.
NOTE: Do not handle bulb with bare hands. Use packaging or a tissue to hold new bulb when replacing. Regency Part# 911-208 Oven Lamp Assembly G9 120V/25W Regency Part# 911-072 Replacement Bulb G9 120 Volt/25 watt | City Series...
maintenance Valve Replacement 7. Remove 16 screws in locations shown below. Important: Always shut off gas supply/120 volt power prior to servicing the gas valve. 1. Turn off unit and allow to cool to room temperature. 2. Remove outer enamel or steel panels—see instructions in the panel removal section in this manual 3.
FPI is not responsible for results or costs of workmanship of unauthorized FPI dealers or agents in the negligence of their service work. Revision Date: September 2016 Regency Gas Products Warranty City Series |...
Page 92
Freight damages for products or parts are not covered under the terms of the warranty. Products made or provided by other manufacturers and used in conjunction with the FPI appliance without prior authorization from FPI may void this warranty. Revision Date: September 2016 Regency Gas Products Warranty | City Series...
Page 93
Product Registraion and Customer Support: Thank you for choosing a Regency Fireplace. Regency strives to be a world leader in the design, manufacture, and markeing of hearth products. To provide the best support for your product, we request that you complete a product registraion form at htp://www.regency-fire.com/Customer-Care/Warranty-Registraion.aspx...
Page 94
Product Registration and Customer Support: Thank you for choosing a Regency Fireplace. Regency strives to be a world leader in the design, manufacture, and marketing of hearth products. To provide the best support for your product, we request that you complete a product registration form found on our Web Site under Customer Care within ninety (90) days of purchase.
Need help?
Do you have a question about the CV40E-NG and is the answer not in the manual?
Questions and answers