Summary of Contents for Regency City Series New York 72
Page 1
MUST READ BEFORE FRAMING IMPORTANT INFORMATION Regency City Series New York 72 CV72E-NG / CV72E-LP FRAMING DIMENSIONS SPECIFICATIONS HEAT RELEASE REQUIREMENTS QR LINK FOR PDF DIGITAL COPY OF SPECIFICATIONS:...
Page 2
dimensions Dimensions 3 3 8 8 1 1 1 1 1 1 6 6 " " 3 3 8 8 1 1 1 1 1 1 6 6 " " 9 9 8 8 3 3 m m m m 9 9 8 8 3 3 m m m m Ø...
installation Gas Connection - Back of Unit removable knockouts 3-7/8" 17" 5" 5" 5" 17" 36-1/4" 36-1/4" Gas Connection - Bottom of Unit Opening at unit base Gas Valve Back of Unit 14-1/2" Front of Unit Gas Connection - Side of Unit tooltip Back of Unit Front of...
installation Electrical Connection - Bottom of Unit Front of Unit 77-7/16" Receptacle 8" Back of Unit Electrical opening Electrical Connection - Side of Unit Front of Back of unit unit 4" 2-3/4" | City Series CV72E...
Ventilation Openings Regency's patented Cool Wall system releases warmth at ceiling level. This system reduces excessive radiant heat in front of the fireplace so you can enjoy your fireplace more often. • Design your own chase vent solution to suit your home •...
Min 42.25” (1073 mm) installation Chase Enclosure Opening for vent When choosing to install the ventilation openings from the front or both sides, The top of the ventilation opening cannot be any lower than 0-2" (51mm) 4”-4.5” from the top of the chase enclosure for all installations. Minimum height of enclosure from base of appliance is 87"...
Page 7
installation Clearances The clearances listed below are minimum distances unless otherwise stated: A major cause of chimney related fires is failure to maintain required clearances (air space) to combustible materials. It is of the greatest importance that this fireplace and vent system be installed only in accordance with these instructions. Flue Clearances to Combustibles Clearance: single sided Dimension...
installation Mantel Clearances Combustible mantel clearances from top of front facing are shown in the diagram on the right. 1/2" (13mm) Drywall, wood, wood panel, etc. 12" (305mm) 9” (229mm) 5-1/8" (130mm) To Bottom of Top of Fireplace Fireplace 15-1/16" Opening Opening (382mm)
CITY SERIES installation Chase Vent Installation CV72E CHASE VENT INSTALLATION Framed Opening must be between 5” and 5.5” tall, and at least 74.25” wide to accomodate the Chase vent. The top of the chase vent opening must be 2” or less from the top of the chase enclosure. Min 74.25”...
Page 11
CITY SERIES installation Finish edges of drywall with trim or corner bead. Edge nish must not decrease opening area below 306in (4.25”x72”) City Series CV72E | 919-830b 01.23.18...
Page 12
CITY SERIES installation Frame opening for vent Screw Chase vent to Framing Use at least 4 sets of screws (See Vent Framing Clearances Page) to keep the vent at against framing Drywall Frame wall with nishing material If necessary, mark where the Cut hole in nishing material chase vent is located before around inside of chase vent.
Page 13
installation CITY SERIES Extended View Panel Installation EXTENDED VIEW PANEL INSTALLATION 1. Construct the sealed rear enclosure to specified width shown below 4. Move unit into framed opening at desired height and level unit on all and desired height (see unit manual for detailed framing instructions). sides.
Page 14
CITY SERIES installation 7. Install venting before proceeding (see unit manual for details). 10. Install inner panels (refer to instructions in unit manual). Install inner panels Install venting 11. Install glass panels onto base panels (glass panels are secured in place with magnets).
Page 15
installation Wall Board/Drywall Installation WARNING! Risk of Fire! Comply with all minimum clearances to combustibles as specified. Finishing Instructions It is important to follow the framing and finishing instructions to ensure proper placement of fireplace into the surrounding framing/finishing materials. Wall board materials 1/2 in.
installation Framing and Finishing Inset Installations Drywall Lip - Bottom and Sides (Optional) 1. Frame in the enclosure for the unit with framing material If desired the finishing lip on both sides and bottom may be removed. Re- Note: When constructing the framed opening ensure there is access to install move the 2 screws on each side to remove the side drywall lip and loosen the gas lines,electrical.
288in using a reveal using a reveal Chase Vent opening to vent the chase Chase Vent opening to vent the chase Shown with Regency Shown with Regency Chase Vent 666-991 Chase Vent 666-991 Header Stud Header Stud Max 5 ”...
FLUSH TV WITH HEARTH Maximum TV Recess Flush TV with Hearth Max 2” To Top of Enclosure 288in Chase Vent opening Shown with Regency Chase Vent 666-532 Max 4 ” TV recess with drywall up against unit Header Stud Max 5 ”...
Page 19
installation Finishing CV72 Finishing Flush Install Example - Front edge of side liner panels must not be covered by nishing material or - Loosen screws using supplied O set removal of the Firebox Glass will not be Screwdriver and remove bottom and - Finish up to trim on all 4 sides possible side trim pieces...