2. Installation
• Be sure to put the heater harness (Long) in the hole on keeping the end of the heater harness (Long)
horizontally long. This makes insertion easy.
22. Pass the support bracket between the copier and the heater harness (Long) on keeping the end of
the heater harness (Long) in the hole.
• To do step 22 easily, be sure not to pass the heater harness (Long) completely thorough the hole
[20] at the step of 21.
23. Attach the edge saddle [21] to the support bracket.
24. Attach the heater harness (Long) and the grounding wire (Long) through the edge saddle as shown.
25. Pass the grounding wire (Long) through the hole.
26. Pull the heater harness (Long) and the grounding wire (Long) to the paper tray unit side.
27. Remove the hole cover [22] of the upper paper tray unit. (
54
x 1)