Furuno BR-500 Operator's Manual page 44

Bridge navigational watch alarm system (bnwas)
Hide thumbs Also See for BR-500:
Table of Contents

Advertisement

4. INSTALLATION
How to fabricate and fix cables to the Processor Unit
Power cables for Processsor Unit (DPYC-1.5 (AC power), DPYC-2.5 (DC power))
L
Sheath
6
Crimp-on lug
Inner diameter ø4
Outer diameter ø7
MPYC-2 (Operator Fitness), MPYC-4
MPYC-7
(Cabin Panel, Timer Reset Panel)
*2
L
Sheath
6
Connect cores to
WAGO terminal
block.
TTYCS-1 (VDR)
L=Distance from cable clamp
to terminal connection
Shield
Connect cores to
WAGO terminal
block.
4-12
Armor
Cut the sheath.
Vinyl tape
Set this part in
cable clamp.
(Motion Detector, Flash Beacon)
*1
L=Distance from cable clamp
to terminal connection
3
Armor
Cut sheath.
Vinyl tape
Remove paint.
L
50
Cut vinyl sheath.
Pull out cables from shield;
solder vinyl wire to shield.
Vinyl tape
Set this part in cable clamp.
L=Distance from cable clamp
to terminal connection
DPYC-1.5: ø = 11.7 mm
DPYC-2.5: ø = 12.8 mm
ø
Set this part in
cable clamp.
Armor
Sheath
Conductor
DPYC-1.5:
S = 1.5 mm
2
ø
= 1.56 mm
DPYC-2.5:
S = 2.5 mm
2
ø
= 2.01 mm
Also available for
*1
Cabin Panel connection.
MPYC-2
= 10.0 mm
Armor
Insulator
Sheath
Conductor
S = 1 mm
ø = 1.29 mm
MPYC-4
ø
= 11.2
mm
MPYC-7
ø
= 13.2
mm
*2
Use MPYCY-7 for
Watertight Cabin
Panel.
TTYCS-1
ø
= 10.1 mm
Armor
Sheath
Shield
Conductor
S = 0.75 mm
2
ø
= 1.11 mm
2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents