Furuno BR-500 Operator's Manual page 40

Bridge navigational watch alarm system (bnwas)
Hide thumbs Also See for BR-500:
Table of Contents

Advertisement

4. INSTALLATION
5. Set the Chassis to the Mount Base. Set the signal cable in the notch in the Clamp.
6. Fasten the Chassis to the Mount Case with binding screws (supplied)
7. Fasten the signal cable to the Clamp with a cable tie.
4-8
Cable Tie

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents