Furuno BR-500 Operator's Manual page 39

Bridge navigational watch alarm system (bnwas)
Hide thumbs Also See for BR-500:
Table of Contents

Advertisement

Lead in the cable from the bottom of the unit
1. Fasten Cable Clamp 2 to the Mount Base.
2. Fasten the Mount Base/Clamp to the mounting location with four self-tapping
screws (supplied).
3. Pass the signal cable through the Mount Case.
4. Connect the signal cable to the WAGO terminal block. See the interconnection di-
agram.
4. INSTALLATION
Mount Base
Clamp
4-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents