Commissioning
of Prototype
Machine using
Sample PLC
Commissioning the prototype
Commissioning
PLC
The "connect status"
should now be green.
First the "Sample PLC blocks" should be uploaded to the PC, then the
modifications can be made to achieve the required functionality. Once this
has been completed, the PLC should be put into stop and the modified
PLC should be downloaded into the PPU. The PLC must then be
"restarted".
PLC Subroutines manual page 25
To continue press the SK
Commissioning Guide
Step 9
Check
I/O's
All I/O status must be checked with the electrical drawing using the
following SK's. The status is shown on the right hand side as shown
above.
Vertical SK's allow you to select digital inputs or outputs and selection of
the byte required.
Choose digital input
Choose digital output
Choose the digital O/I addresses of Byte -
Choose the digital O/I addresses of Byte +
Page 36
s
To continue press the SK