Inspection And Check Procedures; Preparations For Inspections; Ac Line Setting; Sampling Setting - GRAPHTEC GL820 Service Manual

Hide thumbs Also See for GL820:
Table of Contents

Advertisement

5. INSPECTION AND CHECK PROCEDURES

5.1 Preparations for inspections

5.1.1 AC Line Setting

(1) Set the AC Line cycle setting of the GL820 to the same cycle as that of your AC line (See Section 4.2).

5.1.2 Sampling setting

(1) Set the Sampling setting of the GL820 to at least 1 sec or longer.

5.1.3 Copy the condition settings file

Condition settings files :GL820ConditionVolt.CND
(1) Copy the condition settings file to a USB memory device from the computer.
GL820-UM-251-9370
:GL820ConditionTC.CND
:GL820ConditionPT.CND
5. INSPECTION AND CHECK PROCEDURES
← Condition settings for Voltage accuracy
← Condition settings for T and K range accuracy
← Condition settings for PT range accuracy
5-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents