Section 3 Installation; General; Equipment Required; Location - ESAB Precision Plasmarc Installation, Operation And Maintenance Manual For Residential Installation

With electronic flow control
Hide thumbs Also See for Precision Plasmarc:
Table of Contents

Advertisement

SECTION 3

3.1 General

NOTICE

3.2 Equipment Required

3.3 Location

CAUTION
!
Proper installation can contribute materially to the
satisfactory and trouble-free operation of the Precision
Plasmarc System. It is suggested that each step in
this section be studied and carefully followed.
Gas Supply and Hoses. Gas supply may be from
a bulk source or from a bank of manifold cylinders
and regulated to supply 125 psig (8.6 bar) to the
Flow Control (gas flowing).
Work Lead. No. 4 AWG cable is recommended for
connecting workpiece to power source.
Primary Input Cable.
25 micron gas filters (or better) are required on the
supply side for the EFC to function properly.
Ventilation is necessary to provide proper cooling
of the power supply.
Minimize dirt, dust and exposure to external heat
sources.
Allow a minimum of two feet clearance around the
power supply for free air movement.
Do Not Restrict Air Flow
Restricting intake air with any type of filter on or around
Restricting intake air with any type of filter on or around
Restricting intake air with any type of filter on or around
Restricting intake air with any type of filter on or around
the power supply may void the warranty.
the power supply may void the warranty.
the power supply may void the warranty.
the power supply may void the warranty.
3-1
INSTALLATION

Advertisement

Table of Contents
loading

Table of Contents