Gas Supply Requirements - AB Sciex 4000 Series Site Planning Manual

Table of Contents

Advertisement

Gas Supply Requirements

Return to
checklist.
WARNING! Radiation Hazard, Biohazard, or Toxic Chemical Hazard: Use only
qualified personnel for the installation of all gas supplies and connections,
and make sure that all installations adhere to local regulations and safety
standards.
CAUTION: Potential System Damage: Regulate each supply separately at the mass
spectrometer to prevent over pressure damage to the mass spectrometer.
CAUTION: Potential System Contamination: Use compression fittings for gas line connections.
Do not use liquid pipe sealant. If threaded fittings must be used, then Teflon tape may be
used to seal the threads. Do not use soldered fittings unless the tubing is thoroughly
cleaned afterwards.
Figure A-4 Recommended Gas Connections
Site Planning Guide
RUO-IDV-01-0563-A | D5040008 A
Site Requirements
AB SCIEX 4000 Series of Instruments
23 of 33

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents