Mass Spectrometer Bench Requirements
Refer to
Site Layout Requirements on page
Requirement
A moveable or fixed bench meeting physical requirements (dimensions and mass) of the system
as listed in
Laboratory Layout and Site Clearances on page 15
spectrometer with 1 m (40 inches) of clearance on all sides for service access.
Note: If the bench is moveable, then make sure that it is fixed during normal use.
Customer Supplied Solutions and Equipment
Refer to
Customer Supplied Solutions and Equipment on page
Requirement
All required solutions and bottles are available.
Additional Site Planning
Requirement
Site planning for optional peripheral devices and software is completed, as required.
Product Familiarization
Requirement
Go to the AB SCIEX Learning Portal at
an account. When you receive your account information, complete the online learning
modules.
Obtain and review system documentation. Go to www.absciex.com/userguides.
(Optional) A qualified maintenance person (QMP) who is suitably aware of the electrical
and chemical risks associated with servicing laboratory equipment is available for review
of the service procedures with the FSE.
Site Planning Guide
RUO-IDV-01-0563-A | D5040008 A
15.
www.training.absciex.com
Site Planning Checklist
is provided for the mass
30.
and click the link to request
AB SCIEX 4000 Series of Instruments
Complete
Complete
Complete
N/A
Complete
N/A
13 of 33