Digital Projection E-Vision 6900 Series
Operating The Projector
Switching the projector on
•
Connect the power cable between the mains supply and the projector. Switch on at the switch next to the power connector.
•
Wait until the self-test has completed and the Power indicator on the projector control panel shows amber. The lamp will be off and the
projector will be in STANDBY mode.
•
Press
on the control panel or
The Power indicator on the control panel will flash green for a few seconds whilst the lamp comes up to full brightness. When the
projector is ready for use, the Power indicator will show steady green.
Selecting an input signal or test pattern
Input signal
•
Connect an image source to the projector. The signal should be automatically detected by the projector, and should be displayed within a
two or three seconds.
•
If more than one signal is connected, then select the image you want to display:
•
On the control panel, press
INPUT
or
•
on the remote control, press the button for the input of your choice,
or
•
on any device, press
MENU
inputs.
Test pattern
To display a test pattern:
1.
Press
MENU
to open the OSD. Use the
of test patterns. Alternatively, on the remote control press
2.
Use the
and
arrow buttons to highlight the test pattern you wish to display and press
UP
DOWN
Installation and Quick-Start Guide
on the remote control.
POWER ON
to cycle through the inputs,
to show the OSD (On-screen DIsplay), then highlight
UP
and
DOWN
arrow buttons to highliught
to open the same list.
TEST
OPERATING THE PROJECTOR
, then press
Input
OK/ENTER
Test Pattern
, then press
OK/ENTER
.
OK/ENTER
Before switching on the projector
for the first time, make sure
the electric circuit is grounded.
Poor grounding may damage the
projector.
Always allow the lamp to cool for
5 minutes before:
- disconnecting the power
- moving the projector
For full details of how to connect an
image source to the projector, see
the Connection Guide.
to open the list of
For full details of how to use the
controls and the menu system, see
the Operating Guide.
to open the list
Notes
Rev A February 2017
page 16