Solenoid Valves - Henny Penny LVG-102 Technical Manual

Split vat & full vat open fryers – gas
Table of Contents

Advertisement

7-6. TEMPERATURE PROBE
REPLACEMENT
(Continued)

7-7. SOLENOID VALVES

Feb. 2011
8. Connect new temperature probe to connector and fasten
connector onto control panel.
9. Replace control panel and reconnect power to vat.
10. Fill vat by pressing and holding a
*FILTER* *MENU* shows in the display. Then once
"1.AUTO FILTER" shows in the display, press
times until "5.FILL POT FROM DRN PAN" shows in
display. Press √ button; "FILL POT FROM DRN PAN"
"YES NO" displays. Press √ button again, display shows
"FILLING" "STOP?"and o il fills vat. Press √ button again,
display shows "FILL POT FROM DRN PAN" "YES NO".
When vat is full, press X twice to return to normal
operation.
Each vat has a solenoid plumbed-into the oil return lines. They
are normally closed, but open when power is supplied, such as,
the controls are filling the vats.
To avoid electrical shock or property damage, move the
power switch to OFF and disconnect main circuit
breaker, or unplug cord at wall receptacle.
1. Remove both top and bottom rear panels, or a side panel,
depending upon the location of the solenoid.
Checkout:
2. Follow the wires from solenoid and through conduit and
then cut wires. Strip wires back and take an ohm reading:
120 Volts - 60Hertz
220-240 Volts -50/60 Hertz
7-9
Model LVG-102, 103, 104
button until
4
50 Ohms
230 Ohms