Figure 4-11. Shunt Trip, Battery Detect, And Thermal Sensor Wiring - Eaton 93PM Installation Manual

Ibc-sw (432v and 480v)
Table of Contents

Advertisement

Building
Alarm TB
10
9
8
7
6
5
4
Thermal
3
Sensor
2
Battery
1
Detect
UPS
Shunt
Trip TB
4
3
2
Shunt
Trip
1
UPS
NOTE 1
IBC–SW1 is closest to the UPS.
NOTE 2
The IBC–SW shunt trip is wired in parallel. The IBC–SW battery detect is wired in series.
NOTE 3
If less than four IBC–SWs are installed, the last IBC–SW TB2-5 connection returns to UPS Battery Detect
Building Alarm terminal.
NOTE 4
Because of the battery shunt trip wiring route in the 93PM UPS cabinet, the wiring from the IBC–SW
battery shunt trip terminals to the UPS must use wire rated for 600V and Class 1 wiring methods.
NOTE 5
The Thermal Sensor is optional. If not installed, terminals TB2-9, and TB2-10 are not used.

Figure 4-11. Shunt Trip, Battery Detect, and Thermal Sensor Wiring

Eaton 93PM Integrated Battery Cabinet-Small Welded (IBC-SW) Installation Manual P-164000639—Rev 1
TB2
10
10
9
9
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
IBC1
IBC2
TB2
TB2
10
9
8
7
6
5
4
3
2
1
IBC3
TB2
10
9
8
7
6
5
4
3
2
1
IBC4
www.eaton.com/powerquality