Vega VEGABAR 54 Operating Instructions Manual page 18

Pressure transmitter
Hide thumbs Also See for VEGABAR 54:
Table of Contents

Advertisement

Connecting to power supply
18
3
Fig. 7: Components of the remote housing for plics instruments
1
Screws
2
Wall mounting plate
3
Cable gland
3 Lead the connection cable through the cable gland on the
housing socket
3)
Information:
The cable gland can be mounted in three positions each
displaced by 90°. Simply exchange the cable gland against the
blind stopper in the suitable thread opening.
4 Connect the wire ends as described under "Single/Double
chamber housing" acc. to the numbering
5 Connect the screen to the internal ground terminal and the
external ground terminal on top of the housing to potential
equalisation
6 Tighten the compression nut of the cable entry, the seal
ring must completely encircle the cable.
7 Attach the mounting plate again and tighten the screws
The electrical connection of the sensor to the remote housing
is finished.
The connection cable is already preconfectioned. If necessary shorten to
3)
the requested length, cut the breather capillaries clean. Remove approx.
5 cm of the cable mantle, strip approx. 1 cm insulation from the ends of the
individual wires. After shortening the cable, fasten the type plate with sup-
port back onto the cable.
1
2
VEGABAR 54 - 4 ... 20 mA/HART

Advertisement

Table of Contents
loading

Table of Contents