Maintenance - Siemens PM240-2 Hardware Installation Manual

Sinamics g120 built-in unit power module
Table of Contents

Advertisement

Service and maintenance

6.1 Maintenance

6.1
Maintenance
The purpose of maintenance is to maintain the specified condition of the Power Module.
Regularly remove dirt and pollution, and replace the fan in plenty of time.
fan (Page 62)
Cleaning
Inverters with IP20 degree of protection
Clean the inverter with an anti-static brush, a vacuum cleaner and areas that are difficult to
access, using dry compressed air (max. 1 bar).
Inverter with through-hole technology (degree of protection IP54, UL type 12 at the rear
panel of the control cabinet)
Clean the heatsink at regular intervals. If necessary, remove the air deflection plate at the
rear. Use a torque of 2 Nm when reconnecting. The fans must be installed if you clean the
heatsink using water.
Ventilation
The devices must be installed in a cabinet. Ensure that the cabinet's ventilation slots are not
blocked. Check that the fan is functioning correctly.
Cables and screw terminals
Regularly check the cables for damage, and immediately replace any defective parts.
Regularly check that the screw terminals have been correctly tightened. Retighten the
screws if necessary.
Note
The actual maintenance intervals depend on the installation and operating conditions.
Siemens offers its customers support in the form of service contracts. For further information,
contact your Siemens regional office or sales office.
60
Hardware Installation Manual, 12/2015, A5E33294624B AD
Replacing a
Power Module PM240-2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents