Checking The Air Supply; Checking The Electronic Module Connections - GE SVI II AP Quick Start Manual

Table of Contents

Advertisement

Checking the Air Supply

Use this procedure to check the air supply.
1. Turn on the air supply.
2. Adjust the filter regulator.
Supply pressure must be a minimum of 10 psi greater than the spring range of the
actuator but may not exceed the rated actuator pressure. Refer to the valve or
actuator instruction manual.
3. Inspect the tubing connections between the filter-regulator and the positioner for
leaks.
4. Verify that the tubing is not bent or crushed.
5. Verify that all fittings are leak tight.
NOTE

Checking the Electronic Module Connections

WARNING
All connections to electronic module in the SVI II AP are made through the terminal board. The
SVI II AP terminal board has a terminal block with cage clamp connectors. Confirm that all appli-
cable connections to the electronics module connectors are correct. Not all options are available
for every model. Refer to Table 6 for available functionality.
Available Functionality
4 - 20 mA Input Setpoint
Display/ Pushbuttons
Remote Mount Input
42 | =GE Oil & Gas
Do not use Teflon pipe seal tape. The Teflon tape can shred into
particles that are harmful to the pneumatic components.
Do not remove the instrument cover or connect to an electrical
circuit in a Hazardous Area unless the power is disconnected.
Table 6: SVI II AP Models and Functionality
Positioner Model Number
SVI II AP-2
Optional
© 2015 General Electric Company. All rights reserved
SVI II AP-3
Optional
.

Advertisement

Table of Contents
loading

Table of Contents