GE SVI II AP Quick Start Manual page 45

Table of Contents

Advertisement

To power up the SVI II AP:
1. Loosen the four (4) cover screws and remove the cover of the SVI II AP. Connect the
+⁄- terminals to the current source + to + and - to -. See Figure 23 on page 43.
Reinstall the cover and display.
2. Adjust current to 12 mA. On initial power up of a newly installed SVI II AP, the
positioner runs in NORMAL mode using the default instrument parameters
installed at the factory. The positioner cycles through the NORMAL cycle menu and
LCD displays the following values:
3. Proceed to Configuration and Calibration.
* For firmware version 3.2.1, the supply pressure appears on the LCD. Additionally, Stops results
and Autotune results, stay displayed until cleared.
NOTE
© 2015 General Electric Company. All rights reserved
PRES: Pressure - unit of measurement and value*
SIGNAL
POS (Position)
An exclamation point (!) appears in the top left corner of the display window
to indicate that there is further instrument status available.
If the SVI II AP is specified without local pushbuttons and display,
local operation is not available. Configure and calibrate with
ValVue and a HART
modem.
®
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 45

Advertisement

Table of Contents
loading

Table of Contents