GE SVI II AP Quick Start Manual page 32

Table of Contents

Advertisement

5. Ensure the turnbuckle assembly is parallel to the stem and the magnets are in the
valve closed position (Figure 17) and connect to take-off bracket.
6. Verify lever is in correct position with valve closed. Adjust rod-ends, if necessary.
7. Mount the SVI-II with M6-1 screws.
8. Cycle the valve open to close verifying proper components movement and that
rod-ends move free and clear from other components.
32 | =GE Oil & Gas
Figure 17 Magnet Position with Valve Closed
Figure 18 Lever Alignment
© 2015 General Electric Company. All rights reserved
.

Advertisement

Table of Contents
loading

Table of Contents