Maintenance; Svi Ii Ap Maintenance; Repair; Tools Needed For Cover Replacement - GE SVI II AP Quick Start Manual

Table of Contents

Advertisement

4. Maintenance

SVI II AP Maintenance

The SVI II AP was designed based on a modular concept. All components are interchangeable
allowing for easy, quick component swapping.
The only maintenance procedures recommended for the SVI II AP are:

Repair

Replacement of the Pneumatic Relay, I/P and cover (with or without display) are the only field re-
pairs permitted.
Only qualified service personnel are permitted to make repairs.
Only factory-supplied parts are permitted. This includes not only the major assemblies but also
mounting screws and O rings. No substitutions with non-Masoneilan parts are permitted.
Detailed replacement procedures are described in the Instruction Manual. The following summa-
ry assures the integrity of the SVI II AP.

Tools Needed for Cover Replacement

© 2015 General Electric Company. All rights reserved
Remove and install the cover
Remove and install the I/P module
Remove and install the pneumatic relay
Upgrade to display cover
WARNING
5 mm hex key for the cover
3 mm hex key for the lanyard
Do not remove the instrument cover or connect to
an electrical circuit in a Hazardous Area unless the
power is disconnected.
If natural gas is supplied, natural gas may escape
from the SVI II AP on removal of the cover or
components.
.
Masoneilan SVI II AP Digital Positioner Quick Start Guide =| 55

Advertisement

Table of Contents
loading

Table of Contents