Installation - Quick BTQ140 User Manual

Bow thruster
Hide thumbs Also See for BTQ140:
Table of Contents

Advertisement

Available languages

Available languages

INSTALLATION REQUISITES
THE TUNNEL
• The position of the tunnel will depend on the interior and exterior shape of the boats bow.
• Optimal positioning of the tunnel will be in the bow and as low as possible, at least 0.75 times the tunnel diameter from the
waterline.
• To avoid cavitation in the propeller, the tunnel
must be positioned as low as possible.
• The lever effect in the boat is proportional to the
increase of the distance (L1 and L2) between the
barycentre and the position of the tunnel A and B.
F
For greater lever effect prefer position B to
position A.
SINGOL PROPELLER
• An increase in the length of the tunnel increases the effect of the loss of charge, decreasing the nominal driving force.
• To limit losing charge, the optimal length is equal to 3-4 times the tube diameter; a ratio of up to 6 can be tolerated.
BOW THRUSTER BTQ140 - BTQ185 IT EN - REV006B
minimum 0,75
times tunnel Ø
BARYCENTRE
DOUBLE PROPELLER

INSTALLATION

A
B
L 1
L 2
EN
17

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Btq185

Table of Contents