Section 1: Installing The Cabinet; System Preparation And Configuration; Unpacking; Before Installing - NEC DS2000 Hardware Manual

Hide thumbs Also See for DS2000:
Table of Contents

Advertisement

System Preparation and Configuration
System Preparation and Configuration

Unpacking

Unpack the equipment and check it against your equipment lists. Inspect for physical damage. If you are not
sure about a component's function, review the Product Description Manual. Contact your Sales Representa-
tive if you have additional questions.
Have the appropriate tools for the job on hand, including: a test set, a punch down tool and a digital voltmeter.

Before Installing

Make sure you have a building plan showing the location of the common equipment, extensions, the telco
demarcation and earth ground. In addition, the installation site must meet the requirements outlined in the
Standard Practices Manual.

Site Requirements

The common equipment is contained in the wall-mounted Main Equipment Cabinet. Choose a central location
for the cabinet that allows enough space for the equipment — and provides enough room for you to comfortably
work. Figure 1-1 4 Slot Cabinet Installation Layout on page 1-8 and Figure 1-2 8 Slot Cabinet Installation
Layout on page 1-9 show you about how much space your system requires.
DS2000 Hardware Manual
System Preparation and Configuration
Section 1: Installing
the Cabinet
Section 1: Installing the Cabinet N 1-1
1

Advertisement

Table of Contents
loading

Table of Contents