Power Up And System Leds; Power-Up - NEC DS2000 Hardware Manual

Hide thumbs Also See for DS2000:
Table of Contents

Advertisement

Power Up and System LEDs

Power-Up

Now that all the PCBs you need are installed and you have cabled the system, you can now power-up. The sys-
tem will automatically set up the station and trunk PCBs on power up, See Automatic Slot Configuration on
page 1-4 for more. The system will also automatically set up a station or trunk PCB when you plug it in hot.
You do not need to reattach the right side panel before powering up the system. Leaving the right side panel
removed makes the station and trunk cabling more accessible.
To power up the system (Figure 3-3) through (Figure 3-5):
1.
Make sure the system is properly grounded and the PCB bracket is reinstalled and secured.
2.
Install a surge protector in the AC outlet you intend to use for system power.
3.
Plug the main cabinet's AC power cord into its surge protector.
4.
Turn on the main cabinet power switch. After about 30 seconds, verify the system LEDs.
5.
Verify that the PCBs have successfully powered up.
DS2000 Hardware Manual
LED
Power Supply
CPU PCB
DSTU, ASTU, and ATRU PCBs
Figure 3-3: Power Supply Status LEDs
Power Up and System LEDs
Normal Power-On Status
All three LEDs on (green)
Top LED flashing (slowly green)
Top LED flashing (slowly green)
Bottom LED flashes (yellow) when ports
on the PCB are busy. The faster the flash,
the more ports are busy.
Section 3: Installing Extensions and Trunks N 3-3
3

Advertisement

Table of Contents
loading

Table of Contents