Testing functionality by secondary injection
Define the following three-phase symmetrical quantities (the phase angle is
related to phase L1):
V
VT s
V
0 9
.
V
=
×
×
ts
t FwdZ
,
V
VT p
EQUATION14063 V1 EN
ForwardX
V
arctan
=
ts
ForwardR
EQUATION14058 V1 EN
frequency of V
= 50 Hz
ts
I
CTs
I
I
10459
=
×
=
50
s
50
I
CTp
EQUATION14059 V1 EN
∠I
= 0º
50s
frequency of I
= 50 Hz
50s
I
It
I
CTs
10459
=
×
=
tf
fs
I
CTp
EQUATION14062 V1 EN
∠I
= 180º
tfs
frequency of I
= 49.5 Hz
tfs
Expected result: start of the protection function and trip in zone 2, when trip conditions
are fulfilled.
Test of the boundary between zone 1 and zone 2, which is defined by
ReachZ1
the parameter
The trajectory of the impedance traverses the lens characteristic in
zone 2
Preliminary steady state test at 50 Hz
Go to Main menu/Test/Function status/Impedance protection/
OutOfStep(78,Ucos)/OOSPPAM(78,Ucos):1/Outputs to check the available
service values of the function block OOSPPAM.
Apply the following three-phase symmetrical quantities (the phase angle is
related to phase L1):
V
VT s
,
V
1 1
.
V
=
×
×
ts
t RZ
,
1
V
VT p
,
EQUATION14065 V1 EN
ForwardX
V
arctan
=
ts
ForwardR
EQUATION14058 V1 EN
0 1
.
,
0 9 11931
.
77 81
=
×
×
=
13 8
.
,
59 33
.
arctan
 =
 =
8 19
.
1
= .
1 162
A
×
9000
1
A
1 162
.
×
=
9000
0 1
.
1 1 1435
.
11 44
.
=
×
×
=
13 8
.
59 33
.
arctan
 =
 =
8 19
.
Section 12
.
V
82. . 14°
V
82. . 14°
(Equation 33)
(Equation 34)
(Equation 35)
(Equation 36)
(Equation 37)
(Equation 38)
131