Generator protection REG670 2.0 IEC
Commissioning manual
Software version, Main menu/Diagnostics/IED status/Product identifiers.
Serial number, Main menu/Diagnostics/IED status/Product identifiers.
Installed modules and their ordering number, Main menu/Diagnostics/IED
status/Installed HW.

IED start-up sequence

When the IED is energized, the green LED starts flashing instantly. After
approximately 55 seconds the window lights up and the window displays 'IED
Startup'. The main menu is displayed and the upper row should indicate 'Ready' after
about 90 seconds. A steady green light indicates a successful startup.
1
2
0
t1
IEC04000310 V2 EN
Figure 2:
Typical IED start-up sequence
1 IED energized. Green LED instantly starts flashing
2 LCD lights up and "IED startup" is displayed
3 The main menu is displayed. A steady green light indicates a successful startup.
If the upper row in the window indicates 'Fail' instead of 'Ready' and the green LED
flashes, an internal failure in the IED has been detected. See section
supervision function"
to investigate the fault.

Energizing REX060

REX060 start up sequence

When the injection unit REX060 is energized, the ABB logotype is shown followed
by current REX060 revision status. When the start up sequence is completed, the main
menu (normal display content) is shown. The duration of the start up sequence is a few
seconds.
Setting up communication between PCM600 and the
IED
The communication between the IED and PCM600 is independent of the
communication protocol used within the substation or to the NCC.