Testing functionality by secondary injection
6.
Repeat steps 4 and 5 applying voltages that are related to the second and the last
section of the characteristic; the function operates when IL1 is slightly higher
than: 0.5 A in the second section; 1A in the last section.
7.
Connect the trip output contact to the input channel of the test set in order to stop
the injection and measure the trip time.
8.
If definite time delay is used for the overcurrent step, set the setting Characterist
= IEC Def. Time. Apply the voltages related to the last part of the characteristic
and inject a current IL1 200% higher than the set operation level, and check the
definite time delay for trip (the signals TROC and TRIP of the protection
function VRPVOC are active in trip condition).
9.
If inverse time delay is used for the overcurrent step, the parameter setting
Characterist shall be properly set; we can refer, for example, to the setting IEC
Very inv.; If the IEC Very inverse time characteristic is selected, the trip signals
TROC and TRIP will operate after a time defined by the equation:
13 5
. *
k
t s
[ ]
=
I
1
 −
StartCurr
IECEQUATION2435 V1 EN
where:
t
Operate time in seconds
I
Measured value (for example, phase current)
StartCurr Set operate value
This means that if the measured phase current jumps from 0 to 2 times the set
operate level and time multiplier k is set to 1.0 s (default value), then the TROC
and TRIP signals will operate after a time delay equal to 13.5 s ± tolerance.
Taking into account the above explanation, inject the voltages related to the last
part of the characteristic and inject a current IL1 200% higher than the set
operation level, and check the trip time delay.
If tDef_OC is set to a value different from 0 s, then this time
delay is added to the one that is defined by the IDMT
characteristic.
10. Check the start and operate information that are stored in the event menu.
11. The previous step 8 or 9 may be repeated also for the first and second section of
the characteristic.
12. Supply the IED with symmetric three-phase voltages at their rated values. Go to
Main menu/Settings/IED Settings/Current protection/
VoltageRestOverCurr(51V,2(I>/U<))/VRPVOC(51V,2(I>/U<)):1/
Undervoltage and set the setting Operation_UV = On to activate the
undervoltage stage.
13. Slowly decrease the voltage in two phases simultaneously, until the STUV and
START signals appear.
Section 12
(Equation 92)
173