Completing The Test; Voltage Protection; Two Step Undervoltage Protection Uv2Ptuv; Verifying The Settings - ABB REG670 2.0 IEC Commissioning Manual

Relion 670 series generator protection
Table of Contents

Advertisement

Section 12
Testing functionality by secondary injection
12.5.16.2
12.6
12.6.1
12.6.1.1
176
1.
Connect the test set for the appropriate three-phase current injection to the IED
phases L1, L2 and L3. The protection shall be fed with a symmetrical three-
phase current.
2.
Set the injected current to 113% of IBase, switch on the current and check
operate time of the trip, 120 s.
3.
Decrease the current slowly.
4.
The output signal START will reset if the measured current falls below reset
level or if BLOCK signal is set to one.
5.
Switch off the current.
6.
Set the injected current to 125% of IBase, switch on the current and check
operate time of the trip, 60 s.
7.
Switch off the current.
8.
Set the injected current to 146% of IBase, switch on the current and check
operate time of the trip, 30 s.
9.
Switch off the current.
10. Set the injected current to 209% of IBase, switch on the current and check
operate time of the trip, 10 s.
11. Switch off the current.
12. Set the injected current to 100% of IBase and switch on the current.
13. Decrease the current slowly under I<.
14. The signal TRIPUC will be activated when timer tTrip_I< expires.
15. Finally check that start and trip information is stored in the event menu.
Testing the protection

Completing the test

Continue to test another function or end the test by changing the Test mode setting to
Off. Restore connections and settings to their original values, if they were changed for
testing purposes. Make sure that all built-in features for this function, which shall be
in operation, are enabled and with correct settings.

Voltage protection

Two step undervoltage protection UV2PTUV

Prepare the IED for verification of settings outlined in section
section
"Preparing for test"

Verifying the settings

Verification of START value and time delay to operate for Step 1
in this chapter.
1MRK502053-UEN B
"Requirements"
Generator protection REG670 2.0 IEC
Commissioning manual
and

Advertisement

Table of Contents
loading

Table of Contents