Figure 7:
Select the TCP/IPv4 protocol and open Properties
5.
Select Use the following IP address and define IP address and Subnet mask if
the front port is used and if the IP address is not set to be obtained automatically
by the IED, see
Figure
chosen for the IED.
IEC13000060-1-en.vsd
8. The IP address must be different from the IP address
1MRK502053-UEN B