Siemens MicroSAM Operating Instructions Manual page 97

Table of Contents

Advertisement

10. Interchange the plugs to the solenoid valves MV3 and MV5.
11. Reinsert the RSP module.
12. Close the housing.
The basic device AS09 is now prepared for use of analysis modules of type A.
MicroSAM
Operating Instructions, 06/2012, C79000-G5376-C560-07
Procedure: Preparation for use of analysis modules of type A
View of EPC module
Disconnect the solenoid valve MV5 (plug number 5).
Disconnect the solenoid valve MV3 (plug number 3).
Connect the cable number "3" to the solenoid valve MV5. The cable number "5" is not
required in the configuration of type A.
6.4 Conversion of MicroSAM basic device AS09
Service and maintenance
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents