3 Installing the server blade into the enclosure

Installation sequence and checklist

Step
Description
1
Perform site preparation (see
2
Unpack and inspect the server shipping container and then inventory the
contents using the packing slip.
3
Install additional components shipped with the server. For these procedures,
see the documentation that with the component or the user service guide.
4
Install and power on the server blade.
5
Configure iLO 3 MP access.
6
Access iLO 3 MP.
7
Access UEFI from iLO 3 MP.
8
Download latest firmware and update using HP Smart Update Manager
9
Install and boot the OS.

Installing and powering on the server blade

Preparing the enclosure

BladeSystem enclosures ship with device bay dividers to support half-height devices.
To install a full height device, remove the blanks and the corresponding device bay
divider.
CAUTION:
server blade or the enclosure unless all hard drive and device bays are populated
with either a component or a blank.
1.
Remove the device bay blank.
2.
Remove the three adjacent blanks.
"Site preparation" (page 7)
To prevent improper cooling and thermal damage, do not operate the
Completed
for more information).
13

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BL860c i2 and is the answer not in the manual?

This manual is also suitable for:

Bl860c i4Bl890c i2Bl890c i4Bl870c i2Bl870c-i4

Table of Contents