Installation
UPS Startup
To start up the UPS:
32
1. Turn on the equipment that is connected to the UPS.
2. Plug the UPS power supply cord into the input connector on
the UPS rear panel.
3. Plug the other end of the power supply cord into a grounded,
three-wire, AC receptacle that has been wired in accordance
with NEC specifications.
The UPS performs diagnostic tests and enters Normal mode
with the equipment (load) offline. The
lit. The startup should take about 15 seconds.
4. Press and hold the Output On button until you hear the UPS
beep (approximately one second).
The
indicator remains lit and the Self Test indicator turns
on. The front panel displays the percentage of full load being
applied to the UPS. The UPS is now in Normal mode with the
load online. See "Normal Mode" on page 42 for more
information.
Powerware
9 Prestige Series User's Guide (3000 VA)
®
indicator remains
:
www.powerware.com