Download Print this page

EBARA EPD Instruction And Operation Manual page 26

Advertisement

CALL 1-800-577-8111 FOR SALES AND SUPPORT
EPD, EPPD
Disassembly and Assembly
1. Disassembly
When disassembling pump, have a piece of cardboard or wooden board ready to place
the different parts on as you work. Do not pile parts on top of each other. They should
be laid out neatly in rows. The O-ring and gasket can not be used again once they are
removed. Have replacement parts ready.
Disassemble in the following order, referring to the sectional view.
Be sure to cut off power source before beginning disassembly.
(1) Loosen casing bolts and remove casing.
(2) Loosen bolt at end of pump shaft and lift impeller off shaft.
(3) Remove pump shaft key and mechanical seal.
(4) Loosen inner casing bolts and remove inner casing.
Note 1: Drain the lubricant oil into a container.
(5) Remove the mechanical seal from the main shaft.
Note 2: Be careful not to cut your fingers on the shaft key groove when pulling out
the mechanical seal.
Note 3: Be careful not to scratch or bend the pump shaft during disassembly.
2. Assembly
Re-assemble in reverse order of disassembly.
Be careful of the following points.
(1) During re-assembly, rotate the impeller by hand and check for smooth rotation.
(2) Replace the O-ring.
(3) Replace all parts that are damaged.
(4) Tighten bolts evenly.
Please obtain O-rings, and other parts from pump dealer.
* All specifications subject to change without notice.
In this catalog, the particulars in {
of Units (SI) and given for reference only.
CALL 1-800-577-8111 FOR SALES AND SUPPORT
} are in accordance with the International System

Advertisement

loading

This manual is also suitable for:

Eppd