Download Print this page

EBARA EPD Instruction And Operation Manual page 11

Advertisement

CALL 1-800-577-8111 FOR SALES AND SUPPORT
EPD, EPPD
Submersible Pump Installation
Refer to the installation illustration on the following page for the following instructions. Be
certain sump basin is clean and all power to pump is shut off. If pump fails to operate prop-
erly after installation, refer to the troubleshooting checklist on page 12 or contact EBARA.
General Materials Needed
• One can PVC cement (read instructions carefully)
• One can thread compound (read instructions carefully)
• One male PVC adapter: 1
• Enough rigid PVC pipe and couplings to reach from bottom of sump basin to discharge:
1
1
/
" for
1
/
HP; 1
1
/
4
3
• One Check Valve.
Tools Needed for all pump installations:
Pipe wrench, slot screwdriver, 24-tooth hacksaw, knife or round file.
Step 1
– Thread male PVC adaptor into pump discharge opening.
Step 2
– Cement a 15" piece of PVC pipe to adaptor. Use appropriate diameter piping.
Drill a 1/8" relief hole in the pipe 5" above pump connection. This hole prevents pump
from air-locking.
Step 3
– Clamp Check Valve to top of 15" PVC pipe with water flow arrow pointing
away from pump.
Step 4
– Lower pump into basin. Clamp needed PVC discharge pipe and fittings to
open end of Check Valve.
Step 5
– Plug in pump and fill sump basin with water. Pump should turn on at 13" to
14" water level. Perform several ON-OFF cycles to assure satisfactory operation.
Performance Table
TOTAL HEAD
TOTAL HEAD
ITEM NO
EPPD-3
1/3 HP
EPD-3
1/3 HP
EPD-5
1/2 HP
EPD-7
3/4 HP
EPD-10
1 HP
EPD-15
1
/
HP
1
2
CALL 1-800-577-8111 FOR SALES AND SUPPORT
1
/
" for
1
/
HP; 1
4
3
" for
1
/
,
3
/
, 1 & 1
1
/
horsepower models.
2
2
4
2
(Capacity in Gallons per Minute)
5
10
15
45
39
31
45
39
31
73
67
1
/
" for
1
/
,
3
/
, 1 & 1
2
2
4
20
25
30
35
21
5
21
5
60
51
40
27
74
67
58
49
83
82
75
65
88
81
74
1
/
horsepower models.
2
40
45
50
9
39
27
16
55
42
27
65
54
42
55
25

Advertisement

loading

This manual is also suitable for:

Eppd