Download Print this page

EBARA EPD Instruction And Operation Manual page 12

Advertisement

CALL 1-800-577-8111 FOR SALES AND SUPPORT
EPD, EPPD
PRO Drainer Submersible Installation Diagram
1
1
/
" check valve
2
with rubber sleeve
connectors for
1
1
/
" and 1
4
*All equipment other than pump to be
supplied by others. Pump only supplied
by EBARA.
10
1
/
" Min.
2
Bottom of
inlet pipe
14" Min.
Sump pump
CALL 1-800-577-8111 FOR SALES AND SUPPORT
1
/
" pipe
2
Grounded type
115 volt receptacle
min. height above
floor – 4 ft.
shut-off
gate valve
(optional)
Sump basin 18" to 24" dia.
plastic, fiberglass or concrete
Discharge piping can be PVC or
ABS plastic with proper adapters, or
can be galv. steel
Drill 1/8" relief hole 5" above pump
discharge
Turn on level
Lifting handle
Mechanical float switch
11"
Turn-off level
13
3
/
"
8

Advertisement

loading

This manual is also suitable for:

Eppd