5.
Repeat steps 1–4 for the other mounting rail.
WARNING!
To reduce the risk of personal injury or equipment damage, be sure that the
rack is adequately stabilized before sliding the inner slides into the slide mounting bracket
assemblies.
6.
To install the side rails on each side of the server, align each side rail to the server, and snap
it into place.
7.
Slide the server onto the mounting rails and into the rack.
Installing the server into a seismic rack
21