drive belt to release the belt tension and allow the belt
to be slipped off the pulleys.
Figure 78
1. Top belt
2. Top-idler pulley
4. Using a breaker bar or similar tool, move the idler
pulley for the bottom belt (Figure 78) away from the
bottom drive belt to release the belt tension and allow
the belt to be slipped off the pulleys.
5. Route a new belt around the gearbox pulley, bottom
spindle pulleys, and idler pulley assembly as shown in
Figure 78.
6. Route a new belt around the top spindle pulleys and
idler pulley assembly as shown in Figure 78.
7. Install the belt covers.
3. Bottom belt
4. Bottom-idler pulley
Controls System
Maintenance
Adjusting the Control Lever
Neutral Interlock Switch
1. Stop the machine, move the deck lift switch fully into
the neutral-locked position, set the parking brake, and
remove the ignition key.
2. Remove the bolts securing the front panel and remove
the panel (Figure 79).
2
1
1. Bolts
2. Control panel
3. Loosen the 2 screws securing the interlock switch
(Figure 80).
56
G020875
Figure 79