Toro 30381 Operator's Manual page 14

Traction unit
Hide thumbs Also See for 30381:
Table of Contents

Advertisement

1. Jacking bolts
5. Route the hoses as follows:
• Route the tank hose under the lift cylinder and
between the cylinder mounting brackets to the
valve (Figure 18).
• Route the pressure hose along side the PTO
shaft to the valve (Figure 18).
Note: To emphasis the hose routing, the hoses are
shown without the hose covers installed.
1. Tank hose
6. Connect the drive shaft to the gear box shaft in the
winter frame and torque the bolts (5/16 inch) to
175-225 in-lb (20 to 25 N-m). Install the roll pin
(Figure 19).
Figure 17
Figure 18
2. Pressure hose
1. Pressure hose
2. Tank hose
3. Hose cover
7. Adjust the floor jack to line up the 1.00 inch holes
in the frame and install a coupler pin on each side
(Figure 20).
1. Coupler pin
8. Adjust the floor jack or rock the cab with your hands
as required to install the bolts (3/4 inch) on each side
(Figure 21). Torque the bolts to 265 ft-lb (359 N-m).
14
Figure 19
4. Cable tie
5. Bolts
6. Roll pin
Figure 20

Advertisement

Table of Contents
loading

This manual is also suitable for:

Groundsmaster 7210

Table of Contents