Blower Cone Installation; Impeller Blade Removal Replacement - Peco 21621209 Operator's Manual

Grass collection system for cub cadet tank & lesco z2
Table of Contents

Advertisement

2-11 Blower Cone Installation

Thread (1) 5/16"-18 jam nut P#(K0120) onto each end of
(2) 5/16"-18 x 2-1/2" HHCS P#(K0125). Now partially
thread the bolts into each of the two tabs located on the
blower housing. Place blower cone so the two tabs line up
with the bolts then tighten completely. See Figure 2-11.
Figure 2-11
BLOWER
HOUSING
TABS
BLOWER
CONE
IMPELLER BLADE
3
2
1
(2) 5/16"-18 x 2-1/2"
ALL THREAD HHCS
(2) 5/16"-18 JAM NUT
4
5
2-12 Impeller Blade
Removal/Replacement
To Remove: First remove the center bolt (#1), washer
(#2) and spacer (#3) from the taper-lock bushing (#5).
See Figure 2-12. Next remove the (2) 1/4"-20 bolts (#4)
and place them into the threaded holes of the taper-lock
bushing (next to the holes they were removed from).
Gradually thread each bolt evenly into the taper-lock
bushing, forcing the blade to break-away from the taper-
lock bushing. If the impeller will not move, hit the base of
the impeller, between each vein, with a hammer, then try
again.
To Replace: Place impeller blade over the engine shaft.
Slide the taper-lock bushing on to the engine shaft and
into the impeller blade, aligning the non-threaded holes
of the taper-lock bushing to the threaded holes of the
impeller blade. Fasten by using (2) 1/4"-20 HHCS grade
#8 bolts, (1) spacer washer and (1) HHCS bolt w/
washer. Torque to the proper specifications in the torque
chart on the back of this manual. Next, rotate the
impeller blade to insure that the blade is clear of contact
on all sides of the blower housing.
Figure 2-12
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

336212052162121533621208

Table of Contents