Downgrade a full system navigation
•
•
•
Preparing for full system downgrades
Before performing full system downgrades, follow the instructions in this
procedure.
Procedure Steps
Step
1
Copyright © 2007-2008 Nortel Networks
.
"Preparing for full system downgrades" (page 117)
"Downgrading a redundant system" (page 118)
"Downgrading a non-redundant system" (page 118)
Action
(Optional) Compose a list of all Network Elements and the
servers they reside on, including the redundant Network
Elements. Use this list to keep track of which Network Elements
have been downgraded.
Application Server 5300
Nortel AS 5300 Installation
NN42040-300 01.04
4 November 2008
Downgrade a full system 117