OPERATING INSTRUCTIONS
Operation During Break-In
Period
Engine
A break-in period of 10 operating hours
is required before running the vehicle
at sustained full throttle.
During this period, maximum throttle
should not exceed 1/2 to 3/4 opening.
However, brief full acceleration and
speed variations contribute to a good
break-in. Continued wide open throt-
tle accelerations, prolonged cruising
speeds and engine overheating are
detrimental during the break-in period.
Starting the Engine
Insert key in ignition switch and turn to
ON position.
vmo2008-011-027_b
Place the emergency engine stop
switch to RUN position.
vmo2008-011-038_a
Shift transmission to NEUTRAL posi-
tion or press and hold clutch lever.
vmo2008-011-019_c
vmo2008-011-004_b
Press and hold engine start button until
engine starts.
vmo2008-011-038_b
Release button immediately when en-
gine has started.
_______________
65