Beechcraft TRAVEL AIR 95 Shop Manual page 92

Table of Contents

Advertisement

d.
Brush
a heavy
coat of Bostik
1008 (one part
ac-
stretching
and should
fall within
1/4 inch of
the
glue
celerator
B is
mixed,
by weight,
to
40 parts
of ce-
line.
Roll
the
boot firmly
by
working
outward
from
ment A) on the primed
blade
and a similar
coat on
the
the
full length
of
the
center
line
in
order
to
prevent
sanded
side of the boot
.
Allow
to
stand
45
minutes
excessive
local
stretching
and
the
trapping
of air
and
repeat
the
brush
coat operation
on both surfaces.
under
the
boot
.
e.
Allow
the
second
cement
coat
to
dry about
30
f
.
Remove
the
masking
carefully
so
that
the 1 4
minutes
before
placing
the
boot into
position.
Do
this
inch glue line around
the
boot remains
undisturbed.
by aligning
the
feed end center
with
the
propeller
hub
mark
and working
outward.
It is necessary
to
stretch
g.
Remove
any
trapped
air with
the
aid of a hypoder-
the
boot lengthwise
over
the
blade
in
the
area
between
mic
needle
and roller.
the
root end and
the
Gat cross
section
in order
to
prevent
wrinkling
of
the
boot at
the
edges.
The out-
h.
Allow
the
installation
to
cure
48 hours
undisturbed
ward
section
of
the
boot will lay into position
without
before
placing
into service.
3-59

Advertisement

Table of Contents
loading

Table of Contents