NEC Express5800 User Manual page 28

Hide thumbs Also See for Express5800:
Table of Contents

Advertisement

Overview
This chapter describes how to select a site, make cable connections, and power
on the system. Information on front and rear panel features, switches and LEDs
are also included in this chapter.
Selecting a Site
The system operates reliably in a typical office environment.
Choose a site that is:
!
Near grounded, three-pronged power outlets.
Note
NEMA 5-15R outlets for 100-120 VAC or NEMA 6-15R
outlets for 200-240 VAC. For other international sites, this
means three-pronged power outlets applicable for the
electrical code of the region.
Be sure the power service connection is through a properly
grounded outlet.
!
Clean, dust-free, and well ventilated. Front and rear ventilating openings
kept free of obstructions. Away from sources of heat, vibration or
physical shock.
!
Isolated from strong electromagnetic fields and electrical noise produced
by electrical devices (such as air conditioners, large fans, large electric
motors, radio and TV transmitters, and high-frequency security devices)
!
Spacious enough to provide at least five inches (13 centimeters) behind
the system and three inches (eight centimeters) on each side of the system
for proper cooling, airflow, and cable clearance.
!
Easily accessible for system maintenance and installation of system
upgrades.
2-2 Setting Up the System
: For the United States and Canada, this means a
!
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

Express120ee

Table of Contents