Page 16
Brute
NATURAL GAS
REQUIRED
CU FT
SIZE
/ HR.
TO SIZE PIPING:
Measure linear distance from meter outlet to last
150
150
boiler. Add total input of all boilers and divide
by 1000 to obtain cu ft / hr required. Add total
199/210 199/210
equivalent length of fittings used according to
285
285
Table 6B. Align total length (pipe and fittings) on
left side column of Table 6C with highest cubic
399
399
feet of gas required.
500
500
Notes:
600
600
Consult and confirm with Applicable Fuel Gas
Code before beginning work. Verify gas inlet
750
750
pressure is between 4 and 13 in W.C. before
starting boiler.
850
850
Table 5.
EQUIVALENT LENGTHS OF STRAIGHT PIPE FOR TYPICAL SCH 40 FITTINGS
NOMINAL PIPE SIZE
1/2"
3/4"
FITTING
LINEAR FEET
3.6
4.4
90° ELBOW
4.2
5.3
TEE
Table 6.
Equivalent Lengths of Straight Pipe, SCH 40
SCH 40 METAL PIPE CAPACITY FOR 0.60 SPECIFIC GRAVITY NATURAL GAS
NOMINAL PIPE SIZE
1/2"
3/4"
LENGTH
FT
CUBIC FEET OF GAS PER HOUR
20
92
190
40
130
60
105
80
90
100
Table 7.
Nominal Pipe Size @ 0.30" W.C. Press Drop
SCHED 40 METAL PIPE CAPACITY FOR 1.50 SPECIFIC GRAVITY
UNDILUTED PROPANE
NOMINAL PIPE SIZE
11" W.C. INLET AND 0.5" W.C. PRESSURE DROP
@
1/2"
3/4"
SIZE
LENGTH
MAXIMUM CAPACITY IN THOUSANDS OF BTU PER HOUR
20
200
418
40
137
287
60
110
231
80
94
197
100
84
175
NOTES:
1. Follow all local and national LP gas codes for line sizing and equipment
requirements.
2. Verify that inlet gas pressure remains between 4 and 13 inches of water
column before and during operation.
Source: ANSI Z223.1-80 National Fuel Gas Code.
Table 9.
Nominal Pipe Size @ 0.11" W.C. and 0.5" Press Drop
1"
1-1/4"
1-1/2"
5.2
6.6
7.4
6.6
8.7
9.9
0.30" W.C. PRESSURE DROP
@
1"
1-1/4"
1-1/2"
350
730
1100
245
500
760
195
400
610
170
350
530
150
305
460
1"
1-1/4"
1-1/2"
787
1616
2422
541
1111
1664
434
892
1337
372
763
1144
330
677
1014
Section 5 -

PUMP REQUIREMENTS

5.1 Brute Boiler Flow and Head
Requirements
20°F
FLOW H/L
SIZE
GPM
FT
150 14.3 28.5
20 24.1
199/210
285
27 25.5
399
39
28
500
48
24
600
58
44
750
72
37
850
81
33
2"
8.5
11°C
12
FLOW H/L
SIZE
lpm
m
150
54
8.7
76 7.3
199/210
285 102 7.8
2"
399 148 8.5
500 182 7.3
2100
600 220 13.4
1450
750 273 11.3
1150
850 307 10.1
990
870
Table 8. Water Flow Requirements
5.2 Brute Water Heater Flow and Head
Requirements
Flow
2"
Size
gpm
4664
150
19
199
25
3205
285
36
2574
50
399
2203
63
500
1952
60
600**
750**
68
850**
68
* Maximum water hardness of 10 grains per gallon allowed.
** See section 6B.7 on page 27 for pump information.
Table 10. Water Heater Flow Data
B
RADFORD
TEMPERATURE RISE IN °F
25°F
30°F
35°F
FLOW H/L
FLOW H/L
FLOW H/L
GPM
FT
GPM
FT
GPM
11.4 19
9.5 13.6
8.1 11.2
16 16.7 13.4 11.6 11.3
22 17.5
18
14
15 10.5
31
20
25 14.5
22
38
16
32
12
27
46
31
38
22
33
58
23
48
17
41
65
22
54
15
46
TEMPERATURE RISE IN °C
14°C
17°C
19°C
FLOW H/L
FLOW H/L
FLOW H/L
lpm
m
lpm
m
lpm
43 5.8
36
4.1
31
61 5.1
51
3.5
43
83 5.3
68
4.3
57
117 6.1
95
4.4
83
144 4.9
121 3.7
102 2.7
174 9.4
144 6.7
125 5.5
220 7.0
182 5.2
155 4.0
246 6.7
204 4.6
174 3.0
NORMAL WATER*
H/L
Temp
Flow
feet Rise °F
lpm
49
15
72
28
15
95
33
15
98
35
15
189
28
15
239
24
19
227
35
21
257
26
24
257
W
HITE
40°F
FLOW H/L
FT
GPM
FT
7.1 8.8
9
9.9 6.9
13
8
11
19
9
9
24
8
18
29
15
13
36
10
10
41
8
22°C
FLOW H/L
m
lpm
m
3.4
27
2.7
2.7
37
2.1
3.2
49
2.4
3.4
72
2.7
91
2.4
110 4.6
136 3.0
155 2.4
H/L
Temp
m
Rise °C
14.9
8
8.5
8
10.1
8
10.7
8
8.5
8
7.3
11
10.7
12
7.9
13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brute bntv

Table of Contents