Bradford White Brute BNTH Installation And Operation Instructions Manual page 3

Hide thumbs Also See for Brute BNTH:
Table of Contents

Advertisement

Brute
BOILERS AND VOLUME WATER HEATERS
Section 8 -
8.1
The Touch Screen ........................................ 34
8.2
Using the Touch Screen ................................ 34
8.3
Parameters .................................................... 36
8.4
While Operating - Checking Individual
Parameters .................................................... 37
8.5
Controllers ..................................................... 38
8.6
Setting the Date and Time..............................39
8.7
8.7.3 Outdoor Reset Configuration ...................... 40
8.7.7 Modulation Configuration ............................ 41
8.7.8 Pump Connections ..................................... 41
8.7.9 Statistics Configuration ............................... 42
8.7.10 High Limits .................................................. 42
8.7.11 Stack Limits ................................................ 42
8.7.14 System Configuration ................................. 43
8.7.15 Fan Configuration ....................................... 43
8.7.16 Sensor Configuration .................................. 43
.................................................44
8.7.17 Lead Lag Slave Configuration .................... 46
8.8
Building Automation System .......................... 48
8.9
8.10.1 Combustion Setup Procedure ....................... 50
8.10.2 Adjusting CO 2 ............................................... 52
.................... 40
.............................................50
Section 9
9.1
Filling the Boiler System ................................. 54
9.2
First Operation ................................................ 54
9.3
Shutting Down the Brute Unit ......................... 55
9.4
Restarting the Brute Unit ................................ 55
Section 10
10.1
System Maintenance ...................................... 56
10.2
Description ...................................................... 56
10.3
Gas Conversion .............................................. 59
Section 11
11.1
About Lockouts, Holds, and Alerts ................... 60
11.2
Troubleshooting Table ................................. 62-73
11.3
11.4
Lead/Lag Slave Diagnostics ............................ 75
11.5
Statistics ........................................................... 75
11.6
Analysis ............................................................ 75
11.7
Control Snapshot ............................................. 75
11.8
Operating Sequence ........................................ 76
Section 12
12.1
General Information ....................................... 77
12.2
Parts List ...................................................77-79
12.3
Parts Illustrations ......................................80-86
ii

Advertisement

Table of Contents
loading

This manual is also suitable for:

Brute bntv

Table of Contents